Low rating

How to improve your EPC rating

Poor evidence drags ratings down as often as poor fabric. Start by finding out which one you are dealing with.

  • 48-hour turnaround
  • Elmhurst-accredited
  • Fixed price quote

Get a fixed price quote

Three quick steps — about 40 seconds.

Fixed price by 9:30am on Monday

Which certificate do you need?

Tap one to start — it takes about 40 seconds.

Tell us about the property

So we can confirm coverage and the earliest survey date.

Where shall we send the quote?

We will call you back by 9:30am on Monday with a fixed price. No obligation, and we do not pass your details on.

  • Elmhurst-accredited assessors
  • Lodged within 48-hours of the survey
  • Fixed price agreed up front
  • Midlands to London

Why ratings come out low

A low EPC rating is caused by one of two things — a building that genuinely performs badly, or an assessment that could not prove the building performs well — and until you know which, you risk spending money on the wrong problem.

Here is the part nobody tells you when the certificate lands. EPC software is built to be conservative. Where the assessor cannot see, measure or evidence something, the methodology substitutes a default value, and those defaults assume the worst reasonable case. Unproven cavity insulation is treated as no insulation. An undocumented boiler is treated as an old one. Lighting that was not recorded in detail is assumed to be inefficient.

On a borderline building, that is the difference between an E and an F. The fabric did not change; the evidence did.

A rushed hour on site can cost you a band. The building is the same building — the certificate simply records less of it.

Sometimes a re-assessment lifts the rating with no works at all

If your last certificate was produced quickly, by someone who was in and out in half an hour and never asked you for a drawing, there is a reasonable chance the building is being under-recorded.

A properly evidenced re-assessment uses what actually exists: construction drawings, cavity fill certificates, building regulations approvals, boiler and plant documentation, lighting schedules and specifications, commissioning records, O&M manuals and previous refurbishment paperwork. Each piece replaces a pessimistic default with a real figure.

We will tell you honestly whether that is worth doing in your case. Sometimes the first certificate was right and the answer is works. Sometimes it was not, and a day of evidence gathering does what a five-figure project was being lined up to do. Either way you find out before you spend.

What moves a non-domestic rating

Non-domestic ratings are carbon-based, which means the measures that help most are the ones that cut delivered energy and shift it away from high-carbon fuels. In rough order of impact per pound spent:

  • Lighting. Usually the single biggest and cheapest win. LED replacement across a commercial building moves ratings reliably, and in warehouses, retail and large offices it can move them several points.
  • Lighting and heating controls. Occupancy sensing, daylight dimming, zoning, time clocks and optimum start. Cheap, fast, and the methodology recognises them.
  • Heating and cooling plant. Replacing ageing gas plant or direct electric heating with efficient equipment, and heat pumps in particular, has a large effect on a carbon-based rating.
  • Insulation. Roof insulation in single-storey industrial and retail buildings is often the best fabric measure available. Cavity and solid-wall insulation where the construction allows.
  • Building fabric data. Not a measure at all, but proving the fabric you already have. Glazing specification, insulation thicknesses, construction build-ups and air tightness results all feed the model.
  • On-site renewables. Solar PV counts, but it is rarely the cheapest first step and it will not rescue a building with poor lighting and failing plant.

What moves a domestic rating

Domestic ratings respond to a different mix, weighted heavily towards heating and insulation.

  • Loft insulation to current depth — cheap, fast, and still missing or inadequate in a surprising number of properties.
  • Cavity wall insulation where the construction allows it, and internal or external insulation on solid walls where it does not.
  • Heating upgrades: an efficient boiler, or a heat pump, replacing old or electric-only systems.
  • Heating controls: a programmer, room thermostat and thermostatic radiator valves as a minimum.
  • Hot water cylinder insulation and modern cylinder controls.
  • Low-energy lighting throughout — small on its own, but free points.
  • Glazing, which matters, though it is rarely the most cost-effective single measure.
  • Solar PV, which can be decisive on a property stuck just below a band threshold.

The order to do things in

Work in this sequence and you will spend less to get further.

  1. Establish the real rating. An evidence-led assessment, with every document you can find. This is the baseline everything else is measured against.
  2. Do the free points first. Documentation, controls settings, low-energy lamps, cylinder insulation. Measures that cost little and are recognised immediately.
  3. Then the cheap physical measures. Lighting replacement, loft and roof insulation, control upgrades. This is where most of the movement comes from.
  4. Then plant. Heating and hot water are the expensive, disruptive items, so time them with end of life, refurbishment or a void period rather than doing them under pressure.
  5. Then fabric and renewables. Walls, glazing and solar — the long-payback measures that make sense once the easy work is done.
  6. Re-assess at the right moment. One re-assessment after a coherent package of works, not a new certificate after every individual measure.

A note on band thresholds: ratings are banded, so a measure that takes you from 54 to 56 may be worth more than one that takes you from 60 to 68. We model that before you commit, so you are buying a band rather than buying points.

From recommendations to a costed plan

The recommendation report attached to your EPC is a generated list, not a plan. It does not know your lease calendar, your budget, your tenant, or which measures have already been quoted. Taken literally it will send you off doing things in the wrong order.

What we do instead is model your building, test the measures that are realistic for it, and give you the sequence: what each measure costs to install, what it does to the rating, what it saves in running costs, and which combination gets you over the band threshold you need for MEES. Where consent, access or lease terms stand in the way, we say so, because that changes what is actually possible.

You end up with a short document you can take to a board, a lender or a tenant, and a clear answer to the only question that matters: what is the cheapest route to a lettable building.

Frequently asked questions

Can an EPC rating be improved without doing any work?

Sometimes, yes — if the original assessment relied on default assumptions where evidence actually exists. Producing drawings, insulation certificates, plant documentation or lighting schedules can replace pessimistic defaults with real values and lift the rating. It is not a loophole; it is recording the building accurately. If the evidence is not there, the rating stands and the answer is works.

How much can a rating realistically improve?

It depends entirely on the starting point and the building. A commercial property still on fluorescent lighting with no controls has a lot of headroom. A recently refurbished building at a C has much less. We will give you a modelled answer for your building rather than a generic figure.

Do I need a new EPC after improvement works?

Legally, no — your existing certificate remains valid for its 10 years. In practice, yes, if you want the improvements to count for MEES, for marketing or for a lender. The new assessment replaces the old one on the register.

How long should I wait before re-assessing?

Until a coherent package of works is complete. Re-assessing after each individual measure costs you a fee every time and often shows a disappointing jump. Finish the package, then assess once.

Will improving the rating actually reduce the bills?

Usually, though the two are not the same thing. An EPC models standardised use, while your bills reflect how the building is actually occupied and operated. Lighting, controls and plant upgrades tend to show up in both. Measures chosen purely to game a band threshold tend to show up in neither.

Ready when you are

Call, email or send the quote form. One point of contact from enquiry to certificate.